Dashboard
Project
What is being built, and sets of these inputs saved for the next job
Parameter sets
Save everything on this tab under a name and reuse it on the next project. The plan is
never included, so a set can be applied to any layout.
1 Project parameters
Drives every downstream tab. Nothing is costed here.
Structure
Footings, columns, beams and slabs, the soil below plinth, the bands over the walls, the staircase
2 Footing schedule
Diameter cells drop down commercial sizes and also accept typing. Top mesh cells appear once Top mesh is set to Yes.
3 Column schedule
Extent sets the column height. The first lift bar is cut from a stock bar by
where the column starts: standing off a footing cuts it in two, standing off a slab cuts it in
three. GF, GF+1 and GF+2 all start at the foundation, so all three take the half bar. Every
floor above the first then takes one third of a stock bar (4 m of a 12 m bar), with no lap or
development length added. Where the floor height is over 3.2 m, what is left of the column
goes into one bar cut to that height plus a lap.
4 Beam schedule
Type groups beams so you can carry several plinth or floor beam sections.
5 Slab
6 Retaining the soil below plinth
The wall that holds the soil back below plinth level. Rubble masonry is the usual
choice; blockwork is the same wall built from blocks, and which one you use is a matter of local
practice. Extent changes the trench run in Earthwork and the volume in Foundation.
7 Sill
The band under the windows. It is usually cast plain; reinforcement is offered
for the jobs that call for it, laid straight along the walls the band runs on.
7 Lintel
A through lintel runs continuously along every wall at lintel level. A cut lintel is
provided only over openings, with a bearing at each end.
Lintel schedule
8 Chajja, shelves & loft
A chajja is the projection over an opening on an external wall that keeps
the rain off it.
Chajja — dimensions
Chajja — reinforcement
Shelves — dimensions
A shelf is the projection inside a room at lintel level, used for storage.
Tick the wall it runs along in Plan Data and it takes that wall's length; the width here is
the default projection, and a wall can be given its own.
Loft — dimensions
A loft is the slab over a bathroom, toilet or pooja room, used for storage.
Loft — reinforcement
9 Staircase
Dimensions
Reinforcement
9 Railing
Rates per running metre for each material are on the Rates tab.
Doors & windows
Each kind of door, window and opening; how many comes from the plan
10 Doors
These rows describe each kind of door — its size, frame and how it is supplied.
The rows and their numbers come from the plan: a kind appears here when it is first placed on a wall
in Plan Data, and the Nos column counts the walls it is on. Correct its size, frame and supply here.
11 Windows & ventilators
As with doors: each row is a kind of window, ventilator or plain opening, and the
number of them comes from where they are placed on the plan.
Windows
Ventilators
Openings without joinery
A doorway with no door in it, and a niche built into the wall for storage.
Both take masonry out like any opening and neither carries a frame or a shutter. A storage
niche is finished inside in lath plaster, so it needs its depth.
Walls & finishes
Masonry, plastering and tiling
12 Masonry
Tick which unit each wall type is built from. Mixed is normal: 9 inch external in brick,
partitions in block.
Wall thickness
Wall height
Masonry unit
Brick takes 35% of the wall volume in mortar, block 25%, because a
block is larger and has far less joint in it. Choose Mixed to set each wall type
separately below.
| Wall type | Brick | Block |
|---|
Brick dimensions
Block dimensions
Mortar
The openings taken out of the masonry are the doors, windows and ventilators placed on the plan. Counts divide by the nominal unit, that is the unit plus one mortar joint.
12 Plastering
16 Tiling
Floors are set room by room in Plan Data.
Site works
Compound wall, tanks and earthwork
13 Compound wall
RCC columns in the compound wall
14 Tanks
Construction
Water tank outer
—
Septic tank outer
—
15 Earthwork
Leave at 0 to fill to the same height as inside.
Tank excavation is costed on the Tank tab, not here.
Electrical
Points room by room, their heights, and the allowances the drawing cannot show
EL Electrical — points in each room
Tick the points each room needs. They are put on the plan for you; drag any of them
(Plan Data, Electrical) to where it really goes.
EL Electrical — heights and allowances
Used when the points are on the plan. Each point's own height is set on the plan by
selecting it; these are the rest.
Plumbing
Fixtures room by room, and the pipe allowances the drawing cannot show
PL Plumbing — fixtures in each room
Tick the fixtures each room needs. They are put on the plan for you; drag any of them
(Plan Data, Plumbing) to where it really goes.
PL Plumbing — pipe allowances
Used when the fixtures are placed on the plan. The runs along the floor are measured off
the drawing; these are the vertical parts the drawing cannot show.
Settings & commercials
Bar schedule settings, lifting charges, overheads, contingency and GST
17 Other parameters
Values that do not belong to a single trade.
17 Bar schedule settings
Detailing allowances
Columns are cast in lifts and steel is ordered lift by lift. The first lift is normally
half a stock bar, and the starter bar turns through an L at the base to sit on the footing mesh.
Cutting length + lap sizes every column bar to actually reach the top of its lift.
The workbook stock-bar model divides a 12 m bar into two or three regardless of column height,
which under-supplies any column taller than the resulting piece.
Lifting charges
Work on an upper floor costs more to do: everything has to be carried up. A flat share of
everything built on that floor is added to the works cost, as its own item. Set to zero to leave it out.
Taken on the floor’s own bill: every work measured on that floor, with its share of the
electrical and plumbing by the points and fixtures placed on it. The compound wall and the tanks are at ground
level and carry none.
18 Commercials
Added on top of the works cost, each on the running total. Set any to zero to leave it out.
Floor bills and the bill of quantities stay at works cost. These additions appear on
Final Numbers and the client summary, so the measured detail is never mixed with commercial margin.
2 Plan source
All four routes produce the same plan model, so every downstream tab works identically whichever you choose.
✎
Draw
Place rooms with + handles
📄
Import PDF
Vector CAD export
📐
Import CAD
DXF from any CAD tool
▦
Grid system
Set out grids, then wall them
Ground floor
Select a room, then tap a + on any side to attach the next one, or drag the
bar along a side to stretch it.
Edit
View
external
internal
partition
mixed
no wall
column
parade
Add
Arrange
shift-click two or more rooms
Drag to move, drag empty space to pan, wheel to zoom. Shift-click gathers rooms.
Ctrl Z undo · Ctrl Y redo · R turn ·
L lock · Ctrl D duplicate · arrows nudge ·
Delete removes · 0 fits the view.
2.1 Rooms — table view
Room type is functional: Bathroom, Attached Bathroom, Toilet, Pooja and Store are excluded from skirting. Indented rows sit inside the room above.
2.2 Projections — no longer added here
This slab was measured by typing its size rather than drawing it.
It is still counted, so this estimate has not changed. Draw it instead when you next
revise the plan: a balcony as a balcony, and anything else as a room, which measures
its slab, its finishes and its railing properly. Delete a row here once you have.
2.2 Beams drawn on the plan
Each takes a section from the beam schedule and adds its length to that
section's run, so the schedule, the bars, the shuttering and the cost all follow.
Tick Supports slab where the beam carries the slab: the span it crosses is then
measured as two shorter spans, which is what changes the slab steel.
Drafting check
What the drawing says, read back to you. A gap of two inches between two rooms
looks like a shared wall on screen and measures as two external walls, so it is listed here
with the move that would close it.
Derived — this floor
3 Excavation
Every pit and trench on the job, measured once. The working is the
measurement — there is no separate summary to disagree with it.
Filling
Filling happens in stages: back into the footing pits once the footings
are cast, up to the underside of the plinth beam, alongside the beam itself, and outside
the building if the ground is being made up.
Materials to order
Notes
4 Foundation
Footing concrete, PCC, steel and UCR masonry.
Footing concrete
Footing shuttering
Footing steel
The weight of the steel at its rate, and the full bars to buy. Every bar, cut
length by cut length, is under “Footing steel, bar by bar” at the foot of this sheet.
Plain cement concrete
Every PCC in the building, wherever it goes.
UCR masonry
Damp proof course
Stock bars to order
A mesh bar has to come out of a stock length in one piece, so the count is
how many whole pieces one bar yields and how many bars that needs. The last figure is left
unrounded on purpose: rounding each type up on its own orders a spare bar for every type.
Man, material and machine requirement
Footing steel, bar by bar
Every bar the footings take, cut length by cut length: the bar schedule.
Notes
5 Column
Height comes from the extent option on each schedule row.
Column concrete
Column shuttering
Column steel
The weight of the steel at its rate, and the full bars to buy. Every bar, cut
length by cut length, is under “Column steel, bar by bar” at the foot of this sheet.
Height build-up
Every column height, part by part, so it can be checked against a section.
Steel to order, lift by lift
Columns are cast in lifts. The weights are in the steel table above; this is
how many whole stock bars to have on site before each pour.
Man, material and machine requirement
Total
Column steel, bar by bar
Every bar the columns take, cut length by cut length: the bar schedule.
Notes
6 Beam
Beam run comes from the per-edge beam flags in Plan Data.
Beam concrete
Beam shuttering
Beam steel
The weight of the steel at its rate, and the full bars to buy. Every bar, cut
length by cut length, is under “Beam steel, bar by bar” at the foot of this sheet.
Materials to order
Total
Beam steel, bar by bar
Every bar each beam takes, cut length by cut length: the bar schedule.
Notes
7 Brickwork
Wall lengths by type come straight from the plan geometry.
Wall areas & volumes
Materials to order
Notes
Rate profile
Which of your saved rate profiles this job is priced on. Switching replaces every
rate in this project with that profile's, so any figure you have changed here by hand goes with it.
Your profiles are set up under Material in the menu.
R Rates
Every new project starts from your saved defaults.
Escalation multiplies every rate in this project. Use it to re-price an old estimate at
today’s market, then save the set as your defaults if it should carry forward.
Labour
Next in the build queue. Input and Plan Data already feed it.
8 Sill / Lintel / Chajja
Sections, reinforcement and the lintel schedule are set on the Input tab.
Sill band
Lintel
Chajja
Shelves and loft
Coping on the parapet
Bed concrete under the rooms
Steel in sill, lintel, chajja and shelves
The full bars to buy for all of them together. Every bar, cut length by cut
length, is under “Steel, bar by bar” at the foot of this sheet.
Materials to order
Cost
Steel, bar by bar
Every bar the sill band, the lintels, the chajja, the shelves and the lofts take, cut length by cut length: the bar schedule.
Notes
Staircase
Geometry and reinforcement are set on the Input tab.
Staircase concrete
Staircase centering
Staircase steel
The weight of the steel at its rate, and the full bars to buy. Every bar, cut
length by cut length, is under “Staircase steel, bar by bar” at the foot of this sheet.
Railing
Materials to order
Total
Staircase steel, bar by bar
Every bar the staircase takes, cut length by cut length: the bar schedule.
Notes
10 Slab
Panel types and steel method are set on the Input tab; each room picks its panel in Plan Data.
Slab concrete
Slab centering
Slab steel
The weight of the steel at its rate, and the full bars to buy. Every bar, cut
length by cut length, is under “Slab steel, bar by bar” at the foot of this sheet.
Per floor
Panel summary
Materials to order
Total
Slab steel, bar by bar
Every bar, by panel type on each floor, cut length by cut length: the bar schedule.
Notes
11 Plastering
Areas drive both this tab and Painting.
Internal plastering
External plastering
False ceiling
The rooms ticked for a false ceiling in Plan Data, at the supplied-and-fixed
rate on the Rates tab. The ceiling plaster and paint above are not deducted: the ceiling is
measured once either way, and what they finish is the false ceiling rather than the slab.
Rate analysis
Area statement
Notes
12 Doors
The door schedule is entered on the Input tab. Doors placed on walls in
Plan Data override the Nos column there.
Quantities
Materials to order
Notes
12A Windows
The window and ventilator schedules are entered on the Input tab. Windows placed on walls in
Plan Data override the Nos column there.
Quantities
Materials to order
Cost
Notes
13 Painting
Areas taken directly from Plastering.
Internal painting
External painting
Materials to order
Against the Schedule of Rates
Notes
14 Tiling
Every room measured: flooring by its length and breadth, skirting round its walls (none in bathrooms, toilets, pooja and store), wall tiles and the kitchen dado round their walls, less the door.
Flooring
Skirting
Wall tiles, bathrooms and toilets
Kitchen dado
Kitchen platform
Wardrobes, kadapa stone
Wardrobes, plywood
Total
Materials to order
Notes
EL Electrical
The points in each room, and the heights and allowances, are set on the Input tab
(Electrical). Drag any point (Plan Data, Electrical) to where it really goes; the wire, conduit,
switches, sockets and boxes are counted from where the points sit.
What the drawing gives
Points and boards
Man, material and machine requirement
Notes
PL Plumbing
Priced by the fixture and by the metre of pipe, which is how the trade quotes. The
fixtures in each room and the pipe allowances are set on the Input tab (Plumbing).
What the drawing gives
Fixtures and pipe
Man, material and machine requirement
Notes
15 Compound Wall
Length, height and coping are set on the Input tab.
Concrete
Centring
Steel
Columns and plinth beam
Excavation, masonry, coping and plaster
Materials to order
Cost
Notes
16 Tanks
Dimensions and construction are set on the Input tab, including where tank excavation is measured.
Concrete
Centring
Steel
Water tank
Septic tank
Materials to order
Cost
Notes
17 Ground Floor — detailed estimate
Measurement sheet with description, nos, length, breadth, height, quantity, rate and amount. The rate on a line is that work's whole cost (materials, labour and the allied items such as backfill or curing) divided by everything that measures it, so the lines of one work share a rate and the sheet adds up to the works cost. The rate analysis tabs give the item rates.
Items
18 First Floor — detailed estimate
Measurement sheet with description, nos, length, breadth, height, quantity, rate and amount. The rate on a line is that work's whole cost (materials, labour and the allied items such as backfill or curing) divided by everything that measures it, so the lines of one work share a rate and the sheet adds up to the works cost. The rate analysis tabs give the item rates.
Items
19 Second Floor — detailed estimate
Measurement sheet with description, nos, length, breadth, height, quantity, rate and amount. The rate on a line is that work's whole cost (materials, labour and the allied items such as backfill or curing) divided by everything that measures it, so the lines of one work share a rate and the sheet adds up to the works cost. The rate analysis tabs give the item rates.
Items
BQ Bill of quantities
Every item of every work, the floors and the external works taken together: one line for each
item, with its quantity, unit, rate and amount. Doors and windows are itemised frame by shutter and wood by wood,
and plumbing and electrical fixture by fixture, pipe by pipe and fitting by fitting. The floor bills give the
same items floor by floor.
Items
MB Measurement sheet
Every measurement behind the BOQ, one by one: brickwork wall by wall, plaster, paint and flooring room by room,
steel bar by bar, points and fixtures room by room. The works carry the BOQ’s item numbers, and each table adds up to
the quantity on its own sheet. Where a sheet measures a run and the plan gives it wall by wall, the corners and junctions
between the two are a line of their own.
E External works
Compound wall and tanks sit outside the floor bills.
Items
20 Final Numbers
Everything rolled up, priced at item rates work by work. The all-in rates are shown beside each work for comparison.
Basic materials
Cost by work — material and labour
Headline
Per 1000 sqft
Everything to order for the whole job
Added up from the blocks on each sheet, so this and they cannot disagree.
Item rates against lump sum
The estimate is built from item rates, measured work by work.
Notes
21 Labour Bill
Labour component of each work, with its rate per sqft on the area chosen on the Input sheet (slab or built-up). The same figures as the Labour column on Final Numbers.
22 Wood Requirement
Door and window timber together, frames and shutters. This sheet appears when the
windows are of wood; otherwise the timber is all in the doors and is on the Doors sheet.
Q The quotation
The rate you are quoting, on the area the drawing measures. Everything else on this
sheet follows from these two figures and the estimate.
Additional works
Quoted outside the per-sqft rate, each at its own rate and unit. Point one at the work
that pays for it and the margin on that item is measured rather than guessed.
Actual against quoted
Cost is the measured estimate at this project's material profile, plus the contingency
provision — money you expect to spend. Overhead, profit and GST are not counted as cost; they are
part of what is being measured here.
The same job on every material profile
What the job costs, and what this quotation earns, if it is built to each profile on
the shelf. The rate quoted does not move; the cost does.
T Terms and conditions
Generated from this project. Change the drawing, the schedules or the rates and the
document follows. The boilerplate below comes from a template you keep in the side menu.
Payment schedule
The milestones this scope actually passes through. Edit a percentage and the rest
stays as you set it; rebuild to take the milestones from the model again.
Rate caps promised to the client
What the document says you will not go above. Where the estimate prices the same thing,
the cap follows its rate as you change it; type a figure to fix the cap instead. A cap you have already
priced past shows up here before it is signed.
The document
What will be printed. Everything in it is either measured, scheduled, rated or taken
from the template.
S Construction stages
The same works grouped the way a site runs. Use the cost column as a payment plan and
the material columns as an ordering schedule.
Cost by stage
Materials by stage
Steel ordering by stage
Bars of each diameter to order before each stage starts, as counts of stock bars.
Payment plan
Percentages are of works cost. Contingency, overhead and GST from the Commercials
section are added to the final figure, not to individual stages.
✓ Checks
Run before quoting. Errors mean the estimate cannot be relied on; warnings deserve a look;
band checks compare the result against what a residential building normally produces.
Findings
Export the whole project
Header
Fill in the header, choose what to include, then print to PDF or download the data.
Sections to include
Client one-pager
A single page for the client: area, cost, cost per ft² and where the money sits.
No working or schedules.
Data downloads
CSV opens directly in Excel. The backup restores the whole project on any device.
Preview
Tap Preview to render the document here.
B Bar Bending Schedule
Every bar in the project: member, mark, diameter, number, cutting length and weight.
Cutting-length conventions are set on the Input tab.
Schedule
Summary by diameter
Bars by member and diameter
Number of stock bars of each diameter needed for each member.





